Electrical Panel Upgrade • St. Louis & St. Charles

Sub-Panel Installation in St. Louis

Professional sub-panel installation by First Choice Electric, LLC. Serving St. Louis County, St. Charles County, and surrounding areas with licensed electricians, permits included, and same-day inspection.

4.9 Stars410+ Reviews
Licensed & InsuredMissouri #2025001688
Since 201015+ Years Experience
Local CompanyBased in Cottleville
Get Your Free Quote

$1,500 - $3,000

installed

Sub-Panel Installation Services in St. Louis

First Choice Electric, LLC provides professional sub-panel installation services throughout the St. Louis metropolitan area, serving 30+ communities with licensed electricians.

Service Overview

What's included

Whether you're in O'Fallon, St. Charles, St. Peters, or any of the communities we serve, our licensed electricians deliver code-compliant work with same-day inspection.

Permits

Included

Ameren Coord

Included

Timeline

1-2 Days

Inspection

Same-Day

Sub-Panel Benefits

Perfect for garages and workshops. A sub-panel provides:

🔌

Code Compliance

Detached structures need local disconnect

💡

Multiple Circuits

Power lights, outlets, and equipment

📈

Future Expansion

Extra spaces for equipment you add

📐

Proper Sizing

Calculated load for correct wire sizing

Ready to Get Started?

Get a free, no-obligation quote for your sub-panel installation project.

Get Your Free Quote

Why Choose First Choice Electric for Your Sub-Panel

Professional service, transparent pricing, and quality work from St. Louis's trusted electrical contractor.

Remote Power Distribution

Add dedicated circuits in detached garages, workshops, or additions.

60-100 Amp Options

Sized appropriately for your needs—workshop, garage, or pool equipment.

Code Compliant

Proper feeder sizing, disconnects, and grounding per NEC.

Future Ready

Extra breaker spaces for equipment you'll add later.

Panel Brands We Install

We install quality electrical panels from trusted manufacturers. All panels meet current NEC codes and come with manufacturer warranties.

Panels That Need Immediate Replacement

These panel brands have documented safety issues and are no longer considered safe. If you have one of these panels, we strongly recommend replacement.

Not sure what panel you have? We offer free inspections to identify your panel brand and assess its condition.

Our Sub-Panel Process

From first call to finished project, here's what to expect when you work with First Choice Electric.

1

Assessment & Estimate

We inspect your current panel, discuss your needs, and provide a detailed written estimate—no obligation.

2

Approval & Coordination

Once approved, we coordinate with Ameren to confirm scope of work and pull all required permits.

3

Scheduled Disconnect

We coordinate the temporary utility disconnect and schedule your installation date.

4

Install & Inspection

Our licensed electricians complete the work with same-day inspection, then contact the utility to restore power.

Sub-Panel Service Details

Capacity

60A, 100A, or 125A

Breaker Spaces

12-24 typical

Feeder Wire

Sized to load

Location

Garage, workshop, outbuilding

Permit

Included

Documentation

Full paperwork provided

What's Included in Your Sub-Panel

Our quotes are comprehensive with no hidden fees. Here's everything included in your sub-panel price:

Free site assessment
Detailed written quote
All permit fees
Utility coordination with Ameren
Professional installation
Code-compliant work (NEC 2023)
Same-day inspection
Complete documentation provided
First Choice Electric, LLC electricians

Sub-Panel Service Areas

We provide sub-panel installation services throughout the St. Louis metro area.

Sub-Panel FAQ

Common questions about sub-panel installation in St. Louis.

Do I need a sub-panel for my detached garage?+

If you need more than 1-2 circuits in a detached structure, a sub-panel is usually the best approach. It provides a local disconnect (required by code) and room for multiple circuits without running individual wires back to the main panel.

How far can a sub-panel be from the main panel?+

There's no code-mandated maximum distance, but longer runs require larger wire to minimize voltage drop. We'll calculate the proper wire size for your specific installation.

What size sub-panel do I need for a workshop?+

It depends on your equipment. A basic workshop with lighting and outlets: 60A. Adding a welder or large compressor: 100A. We'll assess your current and future needs during the site visit.

Ready for Your Sub-Panel?

Get a free quote for your sub-panel installation in St. Louis. First Choice Electric responds within 24 hours with transparent, no-obligation pricing.

Get Your Free Quote

Installations by

First Choice ElectricFirst Choice Electric, LLC5377 State Highway N, Suite 437, Cottleville, MO 63304

Missouri License #2025001688 | St. Charles County #E25-000008 | St. Louis County #ES4501